Category Archives: Ross County Government

Warming Centers Alerted To Upcoming Cold Blast

Presented by McDonalds, I’m Lovin” It!

Bitter cold temperatures are expected over the next few days and some jurisdictions may be interested in opening warming centers for the public. A warming center is a temporary facility that is made available during extreme temperature conditions when power outages occur or when normal coping mechanisms in the home are ineffective or unavailable. They are open for a limited number of hours for a limited number of days depending on the incident. Warming Centers ARE NOT overnight shelters or homeless shelters, and are not daycare for children, the elderly, or others who cannot care for themselves. It is assumed that the individuals who use warming centers can return to their homes when the center is closed.

Some tips for opening a warming center:

  • Prior to opening a warming center, jurisdictions should determine who the center will provide services for (local residents only, neighboring citizens who may be affected, etc.), what services that the public will need, and the jurisdiction’s ability to meet them. Minimal needs include tables and chairs, television, charging station/outlets, and information updates regarding the “incident” or weather. Prolonged exposure to severe conditions may require expanded services.
  • Determine the hours that your warming center/shelter will be open. Publish those hours and determine what you will do if power is not restored/conditions do not change and your warming center needs to close.
  • Ensure that your warming center is ADA compliant and able to accept service animals (where applicable).
  • Make sure you know the occupant capacity of the building you are planning on using. Overfilling the space/building will violate the fire code.
  • Consider posting code of conduct or rules for occupants of your warming center.  
  • Ensure that lavatory facilities and power are sufficient for temporary occupants. Consider alternative options if the primary warming center becomes full and a secondary location needs to be opened.
  • Make sure the roadways to the warming center are cleared and the parking lots and walkways are clear for occupants.
  • Consider providing security for the warming center. If the center is open to all citizens, you want to ensure the safety of all occupants.
  • Consider checking with your legal/insurance advisors on the liability issues regarding mass sheltering/gathering in your building.
  • Assign someone to document all center activities.  This could help if incidents arise or reimbursements are expected.
  • Alert EMA when/if you plan to open a warming center. EMA will be maintaining county situational awareness during severe weather and will document its impacts on jurisdictions.

These are just some basic tips for warming center operations. Additional considerations for operating a warming/cooling center can provided by EMA. Any jurisdiction considering operating a warming center is asked to create a more formal plan that can be referenced now, or in the future, for all warming center operations.

If your jurisdiction (or a business/organization within your jurisdiction) opens a warming center please let Ross County EMA know so that they can help prioritize response efforts in power outages. The EMA can be reached at rossema@rosscountyohio.gov or 740-773-1700 during normal business hours and 740-253-0939 after hours. 

Ross Engineer’s Office Loses Storage Building To Fire

Presented by Hometown-Motors, Inc.

A cold storage building at the Ross County Engineer’s complex on Fairgrounds Road was destroyed by fire Wednesday evening, according to County Engineer Charlie Ortman.

The 40×150 feet building was a total loss from the inferno that broke out sometime around 8pm. Flames and smoke could be seen in the night sky for miles around. The building was used to store equipment out of inclement weather conditions.

There were no injuries reported to county employees or firefighters who responded to the scene to extinguish the fire.

Ortman says the building contained five pickup trucks, a tandem dump truck, bulldozer and chainsaws among other equipment stored in the building by the county engineering department.

The engineer says the damage of the building and contents is likely to exceed more than one million dollars.

Ortman praised the efforts of both the Union and Scioto Township Fire Departments, saying both did “an outstanding job of getting the fire put out”.

The Ohio State Fire Marshal is investigating the blaze, with no initial cause known at this time. The building and equipment was insured by the county.

The aftermath at noon Thursday following Wednesday’s fire.

SEE MORE PHOTOS HERE

Carnage resulting from the fire February 3rd at the Ross County Engineer’s Office on Fairgrounds Road. Photo by Dan Ramey/Litter Media